Providence Seminary

News Releases

   -->
   PRINT TEXT SIZE   S  M  L  

News

Work continues on residence renovation and Bergen Hall cleanup
2017-07-21
 
Providence is preparing for the September arrival of new and returning students by renovating several of its residence facilities.
 
Work is completed in one of the 28-student capacity dormitories, with new flooring fixtures and furniture having recently been installed. Crews have already begun refurbishing another building, and the renewal of these existing structures will continue over the following weeks and months.
 
The renovations follow the June 1 fire that consumed the Bergen Hall residence. Additional, temporary housing will be put in place in August. Providence looks forward to providing all its residence students with comfortable, modern housing options as it prepares for the construction of new, state-of-the-art, environmentally-friendly living spaces.
 
Meanwhile, cleanup continues at the Bergen Hall site as the campus gets ready for Welcome Week, which begins September 1.
 
(Top: New beds, which can be arranged separately or as bunks, arrive in refurbished suites, along with new desks.)
 
Renovation continues in existing residence facilities.
 
 

Cleanup work at the Bergen Hall site will be completed next month.

 

         

 
10 College Crescent
Otterburne, Manitoba, Canada, R0A 1G0
Phone: (204) 433-7488 or (800) 668-7768
Fax: (204) 433-7158
Copyright @ 2015 Providence
Privacy Policy